Analysis of the Application of Material Requirement Planning Method in Nature to Achieve the Production Targets of the Moraja Donggala Social Forestry Business Group

  • Farid Management Study Program, Faculty of Economics and Business, University of Muhammadiyah Palu, Indonesia
  • Sri Haryani Management Study Program, Faculty of Economics and Business, University of Muhammadiyah Palu, Indonesia
  • Fenny Aldini Management Study Program, Faculty of Economics and Business, University of Muhammadiyah Palu, Indonesia
Keywords: MRP, Production, Targets

Abstract

This study aims to analyze the Application of Material Requirement Planning (MRP) in achieving production targets in the Moraja Social Forestry Business Group (KUPS). The type of research used is a descriptive qualitative method using Material Requirement Planning (MRP) analysis. The results showed that KUPS Moraja has not been able to fully implement MRP, which is in the form of a Master Production Schedule and is on a manufacturing or manufacturing scale. Then related to planning, scheduling orders and controlling raw material inventory items have been carried out even with a conventional system where the Master Production Schedule (MPS) KUPS Moraja carries out or schedules production once a month in week 2 (two) or if there are orders from customers so that in a year the production order schedule occurs 12 (twelve) times. Kups Moraja on Bill of Material (BOM) consists of three processes, namely the drying, grinding, and packing processes. Furthermore, the Inventory Record (Inventory Record), it can be known that the raw materials used during the 2021 period were 39 kg 06 ounces of Moringa leaves. Then for the lead time, the entire production process takes 7 (seven) days, which consists of stages, namely the drying process of Moringa tea takes 5 days, while the grinding process of Moringa tea takes 1 day and the packaging process takes 1 day. Overall, the supply of Moringa raw materials has been controlled using conventional techniques.

References

1. Tirtoni FTF. Internalization of Character Education Models through Preneur Social Leadership in Basic Education to Towards the Industrial Revolution 4.0 Indonesia Is Advancing. EduStream J Basic Educator. 2020;4(1):73–85.
2. SURYANI S. Analysis of the application of target costing by controlling the cost of raw materials to increase profits (case study on cv. Budi utama surabaya). Bhayangkara University; 2021.
3. Alwani RA, Lestari SP, Pauzy DM. Analysis of Raw Material Inventory Control Using the EOQ Method: (Case Study at the Panawangan Ciamis Independent Partner Factory for the 2021 Period). ULIL ALBAB J Ilm Multidisciplinary. 2022;1(9):3166–71.
4. Kasatria H. Analysis of Wire Rod Raw Material Inventory By Economic Order Quantity (EOQ) Method-(Study On PT X). Semen International University of Indonesia; 2019.
5. Setiawan Y, Prawirosentono S. Analysis of Economic Order Quantity (Eoq) as a Tool for Controlling Raw Material Inventory in Streamlining Inventory Costs at Griya Tas Bogor SMEs. Innovator. 2014;4(1).
6. Pitaloka D, Ryandini TP. Community empowerment processes Moringa leaves into health drinks in the village of Dawung Kec. Palang Tuban. J Pengabdi Kpd Masy Wahana Usada. 2020;2(2):18–26.
7. Shah ANA. Conquer the disease with green tea. AgroMedia; 2006.
8. Ramdhan M. Research Methods. Cipta Media Nusantara; 2021.
9. Huberman M, Miles MB. The qualitative researcher’s companion. sage; 2002.
Published
2022-10-20
How to Cite
Farid, Sri Haryani, & Fenny Aldini. (2022). Analysis of the Application of Material Requirement Planning Method in Nature to Achieve the Production Targets of the Moraja Donggala Social Forestry Business Group. International Journal of Health, Economics, and Social Sciences (IJHESS), 4(4), 243-251. https://doi.org/10.56338/ijhess.v4i4.2895
Section
Articles