Kasianto and Fatma Lestari (2024) “Analysis of Safety Climate in Construction of Coal Fired Steam Power Plant (CFSPP) X with Capacity 2x1000 MW”, Media Publikasi Promosi Kesehatan Indonesia (MPPKI), 7(7), pp. 1947-1958. doi: 10.56338/mppki.v7i7.5542.